Free in-person surveys●No photo quotes●OZEV approved installer●Pod Point approved●£2m public liability●BS 7671:2018 +A2:2022 compliant●South Manchester & the Cheshire belt●Free in-person surveys●No photo quotes●OZEV approved installer●Pod Point approved●£2m public liability●BS 7671:2018 +A2:2022 compliant

Pre-Purchase EV Charger Survey

Find out what your home can take, before you buy.

Free in-person survey. Fixed written quote. No obligation — the assessment is yours either way.

  • OZEV Approved
  • Listed on gov.uk
  • City & Guilds Qualified
  • Part P Full Scope
  • BS 7671 Compliant

Before you buy a charger

Real assessment, not a photo guess.

EV charger installs vary wildly. The same charger fitted at two different homes can cost £250 at one and £1,200 at the other — depending on the supply, the consumer unit, and the cable route to the parking spot.

A pre-purchase survey takes the guesswork out before you commit. We come to your home, check the supply, plan the cable route, assess your fuse box, and write you a fixed quote — no obligation, no pressure to proceed.

It’s free. The written assessment from an OZEV approved installer is yours to keep, whether you proceed with us or use it to compare quotes elsewhere. No obligation either way.

The offer

Free in-person. No obligation.

Onsite survey, written quote, no obligation. Book it through us or use the quote afterwards to shop around — the assessment is yours either way.

What we check

What's actually in the survey.

A real survey takes 30–45 minutes onsite, with a written quote following by email. We don’t sell off the back of the visit — we just give you the information you need to make a confident decision.

Main supply check
Capacity assessment of your incoming supply — single-phase or three-phase, current main fuse rating, headroom for additional load.
Consumer unit assessment
Visual inspection of your fuse box — type, age, protection, spare ways. Photos taken for the written report.
Cable route planning
Walk the route from consumer unit to your preferred charger position. Identify the cleanest run, any containment needs, and any potential issues.
Earthing & bonding check
Verify your main earth and equipotential bonding meet current requirements. Note anything that needs attention.
Charger position discussion
Talk through where the charger should go based on parking, access, weather exposure and tidiness.
Tethered vs untethered guidance
Honest advice on which charger type suits your household, car and parking position.
DNO consideration
Check whether your install will need DNO notification or a supply upgrade before going ahead.
Written quote within 48 hours
Fixed-price quote sent by email — itemised, transparent, with nothing changing between the quote and the invoice.

Three example outcomes

What you might find out from the survey.

Surveys broadly produce three types of result. None of them is good or bad — they just describe what your specific home needs. The point is to know which one applies before you’ve spent money on a charger that might not fit your supply.

OUTCOME 01

Most common outcome

Straightforward install

Your consumer unit is fine. Cable route is short and clean. Charger goes on the wall, RCBO added, done in a day. Quote lands in Tier 1 territory — typically £250–£400 for installation.

OUTCOME 02

Common

Some upgrade work needed

Older fuse box, longer cable run, or both. We’d quote consumer unit upgrade alongside the install. Tier 2 territory — typically £600–£1,000 for installation plus board work.

OUTCOME 03

Less common

Bigger job, but possible

Long underground SWA run, supply upgrade or DNO application needed, or full consumer unit replacement. We quote it, you decide. Tier 3 territory — but you know what you’re getting into before you commit.

How it works

Three steps. No pressure.

01

Book the slot

Call, email, or send the quote form. We’ll offer you survey slots within the next week — including weekends.

02

30-minute visit

We come to you. Walk through the supply, fuse box, cable route options. Talk through chargers and what suits your setup.

03

Written quote

Fixed-price quote by email within 48 hours. Itemised and transparent — the figure on the quote is the figure on the invoice.

FAQs

Survey questions, answered.

Most of them offer free DESKTOP quotes — based on photos you send through. Ours is a free IN-PERSON survey, which is a different thing entirely. Photo quotes routinely turn into ‘we found something on the day’ surprise charges; an onsite visit produces a fixed price you can trust. The difference is the visit, not the price.

Yes — the survey takes 30–45 minutes and we need you (or anyone over 18 with access to the property) to be present. We need to look at the fuse box, walk the cable route, and discuss where you’d like the charger fitted.

The survey report is yours regardless of timing. Use it whenever you’re ready to proceed with us, or use it to brief another installer if our schedule doesn’t suit. There’s no time pressure and no obligation either way.

For a rough indication, yes — send photos of your fuse box (open if possible), the meter cupboard, and the spot where you want the charger. We’ll come back with a ballpark range. For a fixed-price quote, we need to be onsite.

Yes — we cover landlord-arranged surveys regularly. Either party (landlord or tenant) can book it. See our Landlord EV Charging page for the full picture on rental properties.

Genuinely rare — most homes can take some form of charger, even if it requires creative routing. But if it really isn’t viable (very old supply with no DNO upgrade path, or restrictive listed-building consent), we’ll tell you straight. You’ll still get a written report explaining exactly why, which can be useful for landlord conversations or insurance claims down the line.

Yes. The report covers everything an installer would need to quote — supply details, board photos, route, distances, any issues. You’re free to use it to get comparison quotes. We’d hope our quote is competitive, but the choice is yours either way.

Book a survey.

Free onsite survey, written quote, no obligation. Same electrician for the install if you proceed.