Free in-person surveys●No photo quotes●OZEV approved installer●Pod Point approved●£2m public liability●BS 7671:2018 +A2:2022 compliant●South Manchester & the Cheshire belt●Free in-person surveys●No photo quotes●OZEV approved installer●Pod Point approved●£2m public liability●BS 7671:2018 +A2:2022 compliant

EV CHARGER INSTALLATION

Hale

OZEV approved EV charger installation, with surveys and installs end-to-end.
  • OZEV Approved
  • Listed on gov.uk
  • City & Guilds Qualified
  • Part P Full Scope
  • BS 7671 Compliant

About this area

Local EV charger installation

Hale’s mostly detached and semi-detached housing means generous driveways, but the consumer unit is often a fair distance from where you’d want the charger. We handle the longer cable runs cleanly — through containment, surface trunking, or fully buried SWA where the route demands it.

Services we cover here

Same four services, every area we work in.

EV Charger Installation

Domestic installs, tethered or untethered, single-phase as standard.

Consumer Unit Upgrades

Older fuse boards brought up to BS 7671 standards.

Pre-Purchase Survey

£60, 50% refunded against the install. No-obligation written quote.

Relocation & Removal

Moving house or selling up — we’ll handle either end of the journey.

Local detail

Postcodes and install patterns.

Postcodes covered

Postcodes in this area

WA15, WA14

What installs look like here

Typical install scenario

Detached homes with substantial driveways. Often Tier 2 because the cable run from house to driveway is longer than a few metres. Modern boards predominantly in good condition.

Where we work

Notable streets & landmarks

Around Park Road, Ashley Road, Bankhall Lane, the Hale village core, side roads off the A538.

Pricing

Same indicative pricing, every area.

Standard installations from £250. Pre-purchase surveys £60 with 50% refunded against the install. Consumer unit upgrades typically £450–£900. Relocation from £180, removal from £120. Final price confirmed in writing after survey.

How it works

From enquiry to handover, four steps.

01

Enquiry

Call, email, or send the quote form. We come back the same working day.

02

Survey

Onsite within a week. Fixed written quote follows by email.

03

Installation

Most installs done in a single day. Same electrician throughout.

04

Handover

Charger commissioned, EIC issued, DNO notification submitted.

Nearby

Other areas we cover.

Nearby areas we cover

Use the Loop Grid widget bound to the area_neighbouring_areas ACF Relationship field, or hard-code 3–4 nearby area links here in the editor per page. See 06-areas-import-guide.md for the recommended approach.

FAQs

Common questions for this area.

Survey slots are usually within a week. Most surveys book onto the next available slot once we’ve confirmed your address. If you’re working to a tighter deadline (completion dates, car arrival dates), tell us when you call — we hold a few flexible slots specifically for time-pressured jobs.

No. The £250-from price applies anywhere in our coverage map. We don’t have a ‘premium area’ surcharge or a ‘further-out’ surcharge. You pay the same as someone five minutes from our base.

Yes. Long runs, awkward angles, side passages, underground SWA — these are normal for us. The survey works out the route options, and the written quote prices the chosen one. No surprises on the day.

Common — about half the homes we survey need some level of consumer unit work. We quote it as part of the EV install, and the combined cost usually works out lower than two separate visits.

Ready for an EV charger?

Quote form, phone, or email — whichever’s easiest. Same-day response on weekdays. Weekend slots available for survey and install.

Every Volt. Charged. Manchester.